The client had relocated a 25 MW generator set to Denmark. Due to the energy supply balance in Denmark, in particular renewable energy versus other fuels, there are times when quick start, generators are required to supplement the power generated by wind.

This unit is such a generator and will be started remotely from the local grid control centre. It was anticipated that the unit would run limited hours per year.

The existing control system was obsolete and unsupported. Greenray were contracted to upgrade the control system to a modern Siemens S7 standard.

The engine/equipment

What we worked on

The upgraded engine was a Frame 5 Gas Turbine Generator Set, being relocated and installed into a new Power House.

The challenge

Meeting the customer's requirements

Since the installed control system was obsolete Greenray engineered a Siemens S7 based upgrade, incorporating a number of software enhancements.

At the same time the client was installing other ancillary upgrades which required significant changes to the control system logic.

The solution

Upgrading the system

The scope of the upgrades was:-

  • Siemens S7 Control System Upgrade
  • Enhanced Turbine Flame Detection
  • Anti-Icing Control
  • Fire & Gas System Logic upgrades

The upgraded system was required to integrate with ancillary equipment upgrades that the client implemented at the same time as the turbine control systems upgrade.

Greenray project managed the specification, engineering, procurement, build, witness test, installation and commissioning work.

Why work with us ?

Choosing Greenray

At Greenray, we strive to continually develop our capabilities in order to provide an unrivalled service. We perform our service capabilities in conjunction with OEM partners to provide the most comprehensive service to our customers.

Unrivalled expertise

Our people are experts and they're all our own. We're extremely proud of our field engineer's pedigree, with expertise ranging from working in difficult offshore environments through to land power generation.

Preventing problems

Although we're adept at solving problems, we prefer to prevent them through regular servicing, which highlights issues before they become a problem.

About Greenray

Bringing you expertise right from the heart of the industry

As a significant player in the water and energy industries, we have an active role in the service, maintenance and overhaul of turbo machinery. Our services include plant relocation and installation, control system retrofits and rehabilitation projects, workshop services and on-site overhauls, component repair and supplying spare parts and technical services.

Case Studies

Multi Platform Service Contract

Multi Platform Service Contract

Offshore Servicing

As the OEM for the former GEC gas turbine fleet, Greenray currently operate a number of service contracts for engines located offshore UK.

Offshore Controls Upgrade

Offshore Controls Upgrade

North Sea Oil & Gas

As a Siemens advanced business partner for the GEC gas turbine fleet, Greenray were contracted to upgrade control and fuel systems Avon generator sets located offshore UK.

ESSO Longford PT Overhaul

ESSO Longford PT Overhaul

Emergency On-site overhaul

As Siemens' advanced partner for services to the GEC gas turbines fleet, Greenray were engaged to overhaul the power turbine in Australia within 5 days, to align with the clients planned outage.

Offshore Integrated Service

Offshore Integrated Service

Offshore Servicing

As the OEM for the former GEC gas turbine fleet, Greenray have recently won a 3 year contract to service three EAS1 gas turbines.

Blackstart Capabilities

Blackstart Capabilities

Upgrading GEC Generators

Upgrades of gas turbine & generator control and fuel systems for a 2 off 60 MW black start, standby sets located at a Hong Kong based power station requiring  an upgrade to their black start capabilities.

EA2 On-Site Power Turbine Overhaul

EA2 On-Site Power Turbine Overhaul

A new lease of life

A field engineer was required at a power station in Northern Ireland at very short notice to inspect a power turbine (PT) following an Avon failure. The PT was found to be heavily damaged requiring a strip down of the gas path to ascertain the full extent.

Denmark Turbine Relocation

Denmark Turbine Relocation

Relocation and Upgrade

The client had relocated a 25 MW generator set to Denmark. Due to the energy supply balance in Denmark, in particular renewable energy versus other fuels, there are times when quick start, generators are required to supplement the power generated by wind.

Castle Peak Relocation

Castle Peak Relocation

Greenray support & expertise

The client had relocated two EM610 generator sets from Hong Kong to Indonesia, in order to provide much needed power and utilise available gas on a quick turn around.